Archive for September 29th, 2008

DRYING OF CLAY MATERIALS

Monday, September 29th, 2008

In the first stage, the ware is warmed from 20oc to 45oc and the relative humidity of the air is maintained at 85%. In the second stage the relative humidity is lowered from 85 to 75%. In the third stage it is reduced to the maximum extent possible and at the same time the temperature […]